Chapter 5 Electrical Requirements
1 Power Requirements
1.1 Electrical Requirements
Innova System requires a specific power line, with three phase (see Illustration in
Distribution).
Table 5-1: Core system
Nominal voltage
380 V ± 10 %
400 V ± 10 %
415 V ± 10 %
480 V ± 10 %
The Hospital circuit breaker should fit the current protection of the Innova system:
150A/ 480V, 3 Phases for UL
80A/ 380V/400V/415V, 3 Phases for CE
Table 5-2: Options
Option
LDM
AW
S5I GE
NOTE:
PDB maximum rating is equal to 211 kVA.
Large Display Option requires an additional power line for Large Display Cabinet (see
illustration in
This power line should fit the current protection requirement of Large Display Cabinet:
30A /120V / AWG10 (UL option)
30A /120V / AWG10 (CE option)
Chapter 5 Electrical Requirements
Frequency
Nominal (at 125 kV,
50 Hz or 60 Hz
(± 3 Hz)
60 Hz (± 3 Hz)
Nominal voltage
100-120 V / 220-240 V
100-127 V / 200-240 V
100-120 V / 230 V
Power
Distribution).
NOTICE
Line impedance should be compliant with IEC 601.2.7 Refer to the table
Line Impedance for feeder line between Generator cabinet and Hospital in
and Grounding
Recommendations.
Innova
IGS 620, Innova
TM
Power consumption
100 ms, 640 mA)
60 kVA
150 kVA
Frequency
50 Hz or 60 Hz (± 3 Hz)
50 Hz or 60 Hz
50 Hz or 60 Hz
IGS 630 Preinstallation Manual
TM
Direction 5694389-1-1EN, Revision 2
Type of power input
Peak
Without Fluoro UPS
3
~
Nominal Power con‐
sumption
3 kVA
11 A / 5.5 A
400 VA
Power
With Fluoro UPS
3N
~
Type of power input
Single phase
Single phase
Single phase
Max