GE Innova IGS 620 Preinstallation Manual page 144

Table of Contents

Advertisement

4 Seismic
4.1 Seismic areas
4.1.1 Floors
Chiller: The seismic kit for both Chillers SMC is included with the chiller when shipped..
LD cabinet : the seismic kit to fasten the LD cabinet to the wall is included with the cabinet when
shipped.
In Seismic areas all cabinets must be anchored to the floor. See
referential documents. Frontal C1, Lateral C1 & C2 Cabinets: Wall support 2285242.
Every sub–system is delivered on site with its proper seismic kit.
Monitor Flat Panel Seismic Kit: 2353317
VCIM seismic kit: 2365510.
4.1.2 Walls
Anti–seismic means be installed before opening the system for normal use.
Consider local seismic codes when planning cabinet mounting. Consult seismic expert to
determine which mounting method is appropriate for the seismic region. Certain seismic regions
require additional reinforcement in walls. See
4.2 Seismic Calculations
Seismic requirements are determined and specified by the hospital/ Design Professional of
record and may require approval by the specific state or country agency.
Seismic attachment hardware shown on seismic calculations may differ from hardware supplied
with system. Any additional hardware that is required will be the responsibility of the institution
and/or their contractor. Contact your local GE Installation Program Manager to obtain seismic
calculations.
Seismic calculations are per California Building Code (CBC) and International Building Code
(IBC).
144
Innova
IGS 620, Innova
TM
System Compatibility
IGS 630 Preinstallation Manual
TM
Direction 5694389-1-1EN, Revision 2
System Compatibility
for referential documents.
for
4 Seismic

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova gs 630

Table of Contents