2.3. Machine erection procedure:

• Step 1. Site preparation and foundation.
Height (h)
Hoist weight
10 m.
20 m.
30 m.
40 m.
50 m.
350 Kg.
60 m.
70 m.
80 m.
90 m.
(*) For intermediates, add 26 kg / m. to table above.
• Step 2. Base to ground positioning and fastening.
420 mm.
BASE JACKS TO SOIL
©
ALBA-MACREL GROUP, S.L.
LOADS TO GROUND PT-450
Base + mast
380 Kg.
640 Kg.
900 Kg.
1.160 Kg.
1.420 Kg.
1.680 Kg.
1.940 Kg.
2.200 Kg
2.460 Kg
REF: u
1080 mm.
MIN:
POSITIONING THE HOIST ON THE GROUND
FITTING TO GROUND RECOMENDATION
USER´S MANUAL
Load
TOTAL (EST.)
1.180 Kg.
1.440 Kg.
1.700 Kg.
1.960 Kg.
450 Kg.
2.220 Kg.
2.480 Kg.
2.740 Kg.
3.000 Kg.
3.260 Kg.
2250 mm.
D
Drill diameter
o
H
Minimum drill depth
1
H
Min. mounting depth
nom
L
Anchor length
L
Screw length
r
TOTAL (DIN. Cd: 1,7)
1.740 Kg.
2.000 Kg.
2.260 Kg.
2.520 Kg.
2.780 Kg.
3.040 Kg.
3.300 Kg.
3.560 Kg.
3.820 Kg.
INSTALLATION DETAILS
10 mm
70 mm
42 mm
50 mm
30 N·m