Rack and pinion transport platform
Table of Contents

Advertisement

Rack and pinion transport platform PT-450
INSTALLING ABOVE/BELOW SLAB
170
P
1
R
1
o
F
42
Kg
V =
R
148
Kg
x =
R
y =
REACTIONS TRANSMITTED TO THE SUPPORT STRUCTURE. CHECKING INTERFERENCE
IMPORTANT:
TRANSMITED FORCES TO THE STRUCTURE DECREASE WHEN INSTALLATION
ANGLE AND DISTANDE "D" ARE INCREASED.
SEPARATE ANCHORAGE PLATES FROM EACH OTHER TO REDUCE TRASNMITTED
LOADS TO STRUCTURE IF NECESSARY. CONSULT THE MANUFACTURER THE
VALUES OF REACTIONS TO THE STRUCTURE RESULTING.
Pag. 20
h1
hnom
RECOMMENDED ANCHORAGE SYSTEM
SEGURO DE TUBO
PIPE SAFETY BOLT
TO VERTICAL TUBES/SCAFFOLD
ALTERNATIVE ANCHORING SYSTEMS
D
Mini. angle (A = 30º)
63
Kg.
ASSEMBLY OF THE MACHINE
D
Drill diameter
o
H
Minimum drill depth
1
H
Minimum mounting depth
nom
L
Anchor length
L
Screw length
r
T
Torque
ins
P
2
R
2
L (mm)
D (mm)
R
(Kgf) R
1
0
1080
75
INSTALLATION DATA
12 mm.
95 mm.
80 mm.
120 mm.
65 mm.
50 N·m
TORNILLO/SCREW M12 DIN 933 8.8
ARANDELA / WASHER A13 DIN 125
TUERCA /NUT M12 DIN 985
SCREWED TO STRUCTURE
(Kgf) P
(Kgf)
P
2
1
2
190
-266
Rev.1.0
(Kgf)
330

Advertisement

Table of Contents
loading

Related Products for Alba PT-450

This manual is also suitable for:

Pt-450-2vPt-450-2vmPt-450-1vPt-450-1vm

Table of Contents