Alba PT-450 User Manual page 35

Rack and pinion transport platform
Table of Contents

Advertisement

Rack and pinion transport platform PT-450
ATTENTION:
REMOVE MAST AND SCREWS ALWAYS AT THE SAME TIME!
NEVER RAISE THE HOIST OVER A NON-SCREWED MAST MODULE!
THEN THERE IS HIGH CHANCE OF COLLAPSE AND SERIOUS INJURY!
Step 2. Dismantling cable system and guides
Remove the cable bracket and remove the cable guides, continuing with the dismantling of masts
column to the lower limit
Step 3. Electrical devices disconnection
Once you reach the lower limit, disconnect power supply and remove electrical equipment.
Step 4. Dismatling the cage
Remove the cage releasing union bolts, by the same procedures described for mounting.
Step 5. Dismantling base frame
Release buffers, remove anchorage to ground. The hoist is ready for transport.
ATTENTION:
IMPORTANT NOTE ON COMPLIANCE WITH EUROPEAN DIRECTIVE 2006/42/CE.
CE DECLARATION OF CONFORMITY is valid only for machines purchased and
installed with all original components supplied by ALBA-MACREL Group, SL and
following all the instructions provided in this user´s manual, ensuring compliance
with all SSER Annex I of Directive 2006/42/EC.
Otherwise, the machine can´t be put into service until final assembly is declared
in accordance with the especifications of Annex II of the Directive.
Pag. 34
ASSEMBLY OF THE MACHINE
Rev.1.0

Advertisement

Table of Contents
loading

Related Products for Alba PT-450

This manual is also suitable for:

Pt-450-2vPt-450-2vmPt-450-1vPt-450-1vm

Table of Contents