Requirements For The Electrical Connection; Erection Of The Hoist; Placement Of The Base Machine - Alba MC250 Original User Manual

Material hoist
Table of Contents

Advertisement

MC250

2.4. Requirements for the electrical connection

 Supply  point  208V  60Hz,  with  thermal  protection  16A  and  differential  protection  of 
300mA. 
 Cable 3x2,5 mm
in),  with  no  others  machines  connected,  to  avoid  voltage  fault  or  losses  of  power  in 
motor.  

2.5. Erection of the hoist

2.5.1 Placement of the base machine 
Pay special attention when moving the MC250 for positioning on  the scaffolding. The MC250 
has a front leg to give stability to the assembly: 
 
 
 
 
 
 
 
 
 
 
 
Place the hoist at the installation site: 
 (+34) 944 71 16 00  (+34) 944 53 17 54  export@alba.es
MC250 Rev.02-USA
2
 connected direct to supply point, with max. lenght of 30 m (98 ft 5,1 
page
 
www.alba.es
12 of 78

Advertisement

Table of Contents
loading

Table of Contents