2. ASSEMBLY OF THE MACHINE

2.1. Introduction.

The following section is dedicated to the safely assembly of the machine. The installation of the hoist can
only be performed by qualified personnel authorized to travel on it.
WARNING:
TO MOUNT THE ELEVATOR SHALL BE USED PROTECTIVE EQUIPMENT AGAINST
FALLS FROM HEIGHT (ACCORDING TO EN 358:1993, EN 361:1993, EN 364:1993)
AND IN ANY CASE A PROTECTIVE HELMET FOR THE HEAD (ACCORDING TO EN
397:1995), PLUS ADDITIONAL MEANS OF PROTECTION.
It is important to follow the instructions in detail , to avoid risks in the assembly and disassembly process.
The user is obliged to observe, by himself, and for those working in the vicinity, all sources of additional
risk, and to comply with all applicable safety standards for the type of equipment used.

2.2. Hoist transport.

The elevator is supplied disassembled, unless specifically indicated otherwise. For assembly of the
components and safe handling of the base assembly and a correct positioning on the ground using a crane
is
needed.
IMPORTANT:
FOR ASSEMBLY OF THE COMPONENTS AND MOUNTING THE
PLATFORM IT WILL BE USED A CRANE-TRUCK, OR IF AVAILABLE,
YOU CAN USE BUILDING CRANE-TOWER.
©