4.4. Ensayos del paracaídas
In accordance with the reference harmonized standard, tests on the parachute have to be performed, in
order to verify its functioning properly.
A) MANUFACTURER TEST
ALBA MACREL GROUP, SL perform a test on each lift during the machine assembly to ensure the safety
and proper functioning of the device. The test result is reflected in the TEST CERTIFICATE, which
accompanies this manual of the machine.
B)
USER TEST
Periodically, every 4 months, or after each assembly machine on site a functional test of the parachute
shall be performed, in accordance with the instructions set out below. The test of the parachute must
be further supplemented with a brake inspection, checking the correct appearance of all the elements
and the sealing of the outer cover. This process is repeated more often if the machine operates in
extreme environmental conditions.
PARACHUTE TEST PROCEDURE
INSTRUCCIONES PARA LA REALIZACIÓN DEL ENSAYO:
WARNING: (ONLY FOR PT-1V)
FOR SAFETY PURPOSE, RELAY HEAD "RDP" IS NOT MOUNTED. INSTALL IT
BEFORE TEST, THAT WAY TEST BOARD WORKS. AFTER TEST, REMOVE "RDP"
1.- The area under the machine must be free of people and obstacles.
2.- The hoist shall be securely fastened to the facade or structure
3.- Remove parachute bridge of the mainboard and connect insted the parachute test board.
4.- Leave the hoist and load the cage with ½·Qn (±500 kg.) and take a position at a safe distance.
5.- Raise the hoist with test board and stop it at approx. 3 m. above the ground.
6.- Turn on the left "TEST" key and let the hoist drop until parachute activates and cage stop. Check if
elevator stops after a litle slip , and then it´s blocked for further descent movements.
7.- To release the parachute, it´s necessary to press "UP" for a while, until display shows RESET. Then
hoist can be recovered and must be descended to reference point. After pressing "KEY" button to
reset, the hoist is released and can be commissioning again.
IMPORTANT:
CHECK THE PARACHUTE PERIODICALLY AND WRITE THE RESULT IN THE
OPERATOR'S MANUAL REGISTRATION.
Pag. 48
SAFETY DEVICE.PARACHUTE FPC-500
.
Rev.1.0

Advertisement

Table of Contents
loading

Related Products for Alba PT-450

This manual is also suitable for:

Pt-450-2vPt-450-2vmPt-450-1vPt-450-1vm

Table of Contents