Figure 5-36 Installing battery cables (four battery packs)
----End

5.3 Installing a Parallel System

Prerequisites
Only single-phase and three-phase inputs support parallel connection.

5.3.1 Rack-Mounted Installation

5.3.1.1 Installing the UPSs and Lead-Acid Batteries

Procedure
Step 1 Install mounting ears on both sides of the UPS.
Issue 03 (2023-08-20)
NO TE
You are advised to purchase circuit breakers for battery cables. For details about the battery
circuit breaker specifications, see
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Installation and Cable Connection
5.1.4 Power
Cables.