STAR T- U P O F M N S D IG ITA L G AT EWAY A ND AP P LI CAT IO N D O W N LO AD
7.7. Start-up of MNS Digital Gateway and application
download

7.7.1. Power-On procedure

Before Power On, complete a visual check of power cable connection and overall
wiring of the switchboard. The MNS Digital Gateway requires parameter settings to
function correctly. Parameter settings are completed with MNavigate. If MNS Digital
Gateway is configured with an optional single MView in a stand-alone configuration
then the default settings can be applied. Otherwise the settings must be configured
before start-up.
Any change of configuration settings on the MNS Digital Gateway requires restart of
the MNS Digital Gateway. During MNS Digital Gateway restart all communication on
the switchgear bus network as well as communication to DCS/PLS/PLC is stopped.
After reboot is completed all communications are re-established.

7.7.2. Power On the control voltage supply

The MNS Digital Gateway boots automatically. At this time the MNS Digital Gateway performs
internal software checks and verifies that the data available on the CF card is correct.
At the end of boot sequence the LED 7 & LED 1 (Run) should be on as a minimum.

7.7.3. Confirm operation

Once correct operation has been established it is then possible to proceed with system con-
figuration and application download.
38