Part Ii - Invoke Upload Mode Via The Front Panel; Part Iii - Invoke Upload Mode Via The Terminal Program - evertz HD9626DSK Instruction Manual

High definition downstream keyer
Hide thumbs Also See for HD9626DSK:
Table of Contents

Advertisement

Configure the port settings of the terminal program as follows:
Baud
57600
Parity
no
Data bits
8
Stop bits
2
Flow
None
Control
4. Power-up the Evertz frame.
3.2.2 Part II – Invoke upload mode via the front panel
Note: If you cannot invoke the upload mode via the front panel outlined in Part II then follow the steps
in Part III.
• Press the SETUP button once.
• Press the down arrow until the main display reads General.
• Press the SELECT button once.
• Press the down arrow until the main display reads Update code.
• Press the SELECT button once.
• Press the down arrow until the main display reads yes, upgrade code.
• Press the SELECT button to confirm the Upgrade operation, press Setup to cancel.
• Skip to step 14.
3.2.3 Part III – Invoke upload mode via the terminal program
5. A banner with the boot code version information should appear in the terminal window.
For example:
EVERTZ 7700 MONITOR 1.0 Feb 2001
COPYRIGHT 2001 EVERTZ MICROSYSTEMS LTD.
9000DP COLD BOOT> |
6. The following is a list of possible reason for failed communications:
• Defective RS-232 "straight-thru" serial extension cable.
• Wrong communications port selected in the terminal program.
• Improper port settings in the terminal program. Refer to step 4 for settings.
• Evertz frame is off.
7. The cursor to the right of the word "BOOT>" should be spinning.
Firmware Update Procedure
Revision 1.0
HD9626DSK Instruction Manual
Page 3-2

Advertisement

Table of Contents
loading

Table of Contents