Dual Cabinet (Fcc) Installation. Eccccceccecceccce; Joining The Cabinets - Prime Computer 50 Series Service Manual

Table of Contents

Advertisement

Installation
Prime Proprietary
35
34
33
TOP
Top
TOP
32
ISU-+ (MASTER CPU)
31
HAT
HAT
HAT
30
29
28
27
POWER SUPPLY
000
26
25
24
23
IsU-2 (SLAVE CPU)
TOP
TOP
TOP
ze
HAT
HAT
HAT
20
19
18
7
POWER SUPPLY
00
16
15
MAX. MEMORY
4
CONFIGURATION
13
8-1MB MEMORY
12
BOARDS
11
10
9
8
7
6
"SSU"(AP) BOARD
3
3
POWER SUPPLY
2
1
0
FIGURE 2-8:
850 MAIN BAY CABINET
2.8.2 850 DUAL CABINET (FCC) INSTALLATION
CS (2275-901)
C (2274-901)
J (2273-901)
eed
A (2285-901)
XIS (2286-901)
CS (2275-901)
C (2274-901)
J (2273-901)
A (2286-901)
XIS (2286-901)
2029-901
cSD-558
The 850 system is contained in two cabinets, the Mainbay
cabinet
and
the
I/O
cabinet (Figures 2-8 and 2-9).
is described as follows.
2.8.2.% Joining The Cabinets
Perform the following procedure to mechanically join the
mainbay
I/O cabinets.
WARNING
Installation of the cabinets
and
ce?
Prior
to joining the cabinets, do not open the front and side
Doing
so
could
result in personal injury and/or damage to the equipment.
doors of a single cabinet at the same time.
070-C
2-
16

Advertisement

Table of Contents
loading

Related Products for Prime Computer 50 Series

This manual is also suitable for:

150-ii250-ii550-ii750850

Table of Contents