Installation and Application Information
Figure 1. Required elevation arrangement.
PLACEMENT OF THE UNIT
CLIC series units are for outdoor applications and can be mounted on the roof or on the ground. For roof mounted applications, install
the unit on a steel channel or I-beam frame to support the unit above the roof.
The use of spring isolators is recommended for roof applications. For ground level applications, install the unit on a solid base that will
not settle. Use a one-piece concrete slab with a foundation extended below the frost line. Ensure that the foundation is level to within 13
mm over its entire length and width.
The foundation must be strong enough to support the weight of the unit ( see "Dimensions and Weights - Single unit on page 21.) The
addition of neoprene pads (customer supplied) under the unit allows water to drain from inside the frame, which can act as a dam.
Installing optional spring or rubber isolators in the shear can also aid drainage.
www.clima-flex.com
iom-clic-cf-eng
9