ABB InCharge Terra 184 Manual page 7

All-in-one 90kw dc fast charger
Hide thumbs Also See for InCharge Terra 184:
Table of Contents

Advertisement

5.3.3
5.4
Replace the standard base with an alternative base....................................................... 45
5.4.1
5.4.2
5.4.3
5.5
Mechanical installation...........................................................................................................47
5.5.1
5.5.2
5.5.3
5.5.4
5.6
Electrical installation.............................................................................................................. 49
5.6.1
5.6.2
5.6.3
5.6.4
5.6.5
5.7
Tilt sensors installation (option).......................................................................................... 52
5.7.1
5.7.2
5.7.3
5.7.4
5.7.5
5.7.6
5.8
Cable management system installation (option)............................................................. 55
5.8.1
5.8.2
5.8.3
5.9
Prepare for commissioning...................................................................................................56
6
Operation........................................................................................... 58
6.1
Prepare before use..................................................................................................................58
6.2
Stop the EVSE if there is an emergency..............................................................................58
6.3
Reset the EVSE after an emergency.................................................................................... 59
6.4
Charge session.........................................................................................................................59
6.4.1
6.4.2
6.4.3
6.5
Energize the EVSE................................................................................................................... 60
6.6
De-energize the EVSE............................................................................................................. 60
6.6.1
6.6.2
6.6.3
6.7
Remove condensation from the cabinet............................................................................ 62
6.8
Local service portal operations............................................................................................ 63
9AKK108466A3703-EN | 001
Prepare a standard prefabricated foundation................................................. 44
Remove the EVSE from the base......................................................................... 46
Install a base with side entrance......................................................................... 46
Install a base with reduced height.......................................................................47
Mechanical installation procedure...................................................................... 47
Open the cable inlet and remove the cable gland............................................ 48
Install the cabinet on the foundation................................................................. 48
Electrical installation procedure..........................................................................49
Connect the PE wire............................................................................................... 49
Connect the enclosure to the earth.................................................................... 50
Connect the AC input wires...................................................................................51
Connect the Ethernet cable...................................................................................51
General procedure.................................................................................................. 52
Install the bracket of the tilt sensors.................................................................. 52
Install the tilt sensors.............................................................................................53
Connect the tilt sensors........................................................................................ 53
Install a ferrule on a wire....................................................................................... 54
Connect a wire that has a ferrule.........................................................................54
Prepare the cable management system.............................................................55
Mount the clamp..................................................................................................... 56
Install the cable management system................................................................56
Charge an EV............................................................................................................59
Start a charge session........................................................................................... 59
Stop a charge session............................................................................................60
De-energize the EVSE - general procedure........................................................60
Measure the AC voltage......................................................................................... 61
Measure the DC voltage......................................................................................... 61
Contents
5

Advertisement

Table of Contents
loading

Table of Contents