Setup And Programming - Bindicator PRD1000 Instruction Manual

Analog input process meter
Table of Contents

Advertisement

PRD1000 Analog Input Process Meter

SETUP AND PROGRAMMING

The meter is factory calibrated prior to
shipment to read in milliamps and volts
depending on the input selection. The
calibration equipment is certified to NIST
standards.
Overview
There are no jumpers to set for the meter input selection.
Setup and programming is done through the front panel buttons.
After power and input signal connections have been completed and
verified, apply power to the meter.
25
Instruction Manual

Advertisement

Table of Contents
loading

Table of Contents