PRD1000 Analog Input Process Meter
Connectors Labeling
The connectors' label, affixed to the meter, shows the location of all
connectors available with requested configuration.
Warning!
Figure 7. Connector Labeling for Fully Loaded PRD1000
Power Connections
Power connections are made to a two-terminal connector labeled
POWER on Figure 7 on page 20. The meter will operate regardless of DC
polarity connection. The + and - symbols are only a suggested wiring
convention.
Do not connect any equipment other than
Bindicator's cables or meters to the RJ45
M-LINK connector. Otherwise damage will occur
to the equipment and the meter.
POWER
+ -
Required External Fuse:
5 A max, 250 V Slow Blow
Figure 8. Power Connections
AC or DC
POWER
20
Instruction Manual