Mitsubishi Electric GOT1000 GT14 User Manual page 225

Graphic operation terminal
Table of Contents

Advertisement

POINT
POINT
POINT
Estimation of processing time
The time required for the processing depends on conditions such as OS, data capacity, and file structure.
(Reference value)
• When the capacity is 4 Mbytes: Around 6 seconds
• When the capacity is 12 Mbytes: Around 18 seconds
(5) Precautions for operation
(a) Copying project data
If the Boot source drive and copy destination drive for project data is the same, the project data cannot be
copied.
If the drives are the same, cancel the setup.
(b) When project data are copied to the GOT
If OS or project data is copied to the GOT using the SD card or USB memory created with GOT data
package acquisition, the utility setting is also copied.
Check each utility setting after copying to the GOT and change the setting according to need.
(c) SD card or USB memory to be used
When performing GOT data package acquisition, do not store other data to the SD card or USB memory.
If doing so, the previous data will be unavailable.
13. FILE DISPLAY AND COPY (PROGRAM/DATA CONTROL)
13.2 Various Data Control
9
10
11
12
13
14
15
16
13 - 91

Advertisement

Table of Contents
loading

Table of Contents