Mitsubishi Electric GOT1000 GT14 User Manual page 181

Graphic operation terminal
Table of Contents

Advertisement

(10) Record load operation
Selected record value is loaded in the device of controller.
1.
Select the recipe file and touch the [Execute]
button.
2.
As the Advanced Recipe Record List screen is
displayed, select the record comment to which you
want to load the device value.
3.
Touching the [Load record GOT
displays the dialog box shown left.
4.
Touching the [OK] button starts loading record.
5.
When loading is completed, completion dialog box
is displayed.
Touching [OK] button closes the dialog.
13. FILE DISPLAY AND COPY (PROGRAM/DATA CONTROL)
PLC] button
13.2 Various Data Control
9
10
11
12
13
14
15
16
13 - 47

Advertisement

Table of Contents
loading

Table of Contents