6. Make a mark at the mid point between the mark (A) (1) and mark
(B) (2) on the inner cable [Mark (C) (3)].
7. Align mark (C) (1) with the cable outer seal end.
8. Push on the shift link end lightly and check for play. If there is
play in the shift link, set the link at the center of the play.
BF175AK3/BF200AK3/BF225AK3/BF250A
(3)
(1)
(1)
Center of the shift
link free play
(2)
(1)
23