www.ti.com
2.2
Pinout
The BOOSTXL-DRV8305EVM brings out a mixture of power, control, and feedback signals to the XL
LaunchPad headers.
•
Terminal block headers for the power supply and motor connections
•
Onboard LM16006 step-down buck regulator to provide 3.3-V power to the LaunchPad
•
Fault reporting through the nFAULT and PWRGD signals
•
SPI to set device configuration, operating parameters, and read out diagnostic information
•
Voltage sense for the voltage supply bus and each phase output (scaled for 4.4- to 45-V operation)
•
Low-side current shunt sensing on each phase (scaled for 0- to 20-A peak current operation)
2.3
Operating Conditions
Table 1
lists the operating conditions.
Parameter
Operating supply voltage
Operating supply current (EN_GATE = Low)
Operating temperature
SLVUAI8A – August 2015 – Revised June 2017
Submit Documentation Feedback
Figure 6. BOOSTXL-DRV8305EVM Pinout
Table 1. Operating Conditions
Copyright © 2015–2017, Texas Instruments Incorporated
Minimum
Maximum
4.4
45
150
–40
125
BOOSTXL-DRV8305EVM User's Guide
Introduction
Unit
V
mA
°C
5
Need help?
Do you have a question about the BOOSTXL-DRV8305EVM and is the answer not in the manual?