Preparing For Operation; Assignment Of The 5-Pin M12 Male Connector; Requirements And Connection To Evaluation Devices - Pilz PIT es Set10u-5ns Operating Manual

Control and signal devices
Hide thumbs Also See for PIT es Set10u-5ns:
Table of Contents

Advertisement

PIT es Set10u-5ns

Preparing for operation

Assignment of the 5-pin M12 male connector

PIN
1
2
3
4
5

Requirements and connection to evaluation devices

For use of PIT es Set10u-5ns (AIDA) an evaluation device must be connected.
Connect the PIT es Set10u-5ns (AIDA)
}
either with a Pilz evaluation device
}
or with an evaluation device with defined properties (see section Defined properties of
evaluation devices:)
Suitable Pilz evaluation devices are, for example:
}
PNOZelog for E-STOP monitoring
– PNOZ e1.1p (Order No. 774 133)
}
PNOZ X for safety gate monitoring
– PNOZ X2.8P (Order No. 777 301 and 787 301)
}
PNOZsigma for safety gate monitoring
– PNOZ s5 (Order No. 750 105 and 751 105)
}
PNOZmulti for E-STOP monitoring
– PNOZ m B0 (Order No. 772 100)
}
PSSuniversal
– PSSu E F 4DI (Order No. 312 200)
}
Decentralised periphery
– PDP67 F 8DI ION (Order No. 773 600)
Operating Manual PIT es Set10u-5ns
1004426-EN-01
NOTICE
Check the function of the emergency stop device before commissioning for
the first time and then at regular intervals (at least annually).
Order no. 400 461
Safety contact/test pulse channel 1
Safety contact channel 1
0 V U
B
Safety contact channel 2
Safety contact/test pulse channel 2
4
3
5
2
1
Function
Order no. 400 462
Safety contact/test pulse channel 1
Safety contact channel 2
0 V U
B
Safety contact channel 1
Safety contact/test pulse channel 2
| 16

Advertisement

Table of Contents
loading

Table of Contents