DLP LightCrafter Single DLPC900 EVM Overview
5.2 DLP LightCrafter Single DLPC900 Evaluation Module (EVM) Hardware
The DLP LightCrafter Single DLPC900 EVM is one half of a complete DMD imaging electronics subsystem. The
DLP LightCrafter Single DLPC900 EVM consists of the single DLPC900 board which includes a single DLPC900
Digital Controller, a digital video receiver, flash memory, power management circuits, and supporting digital logic.
Also needed to complete the imaging subsystem is a DLP LightCrafter Single Controller DMD EVM which is
compatible with the LightCrafter Single DLPC900 EVM. A DMD EVM consists of a DMD, a DMD board (pcb)
containing on-board DMD power circuits, DMD mounting hardware when necessary, and a flexible (pcb) cable
for connections to the Single DLPC900 board.
Figure 5-1
outlines the major hardware components of a DLP LightCrafter Single DLPC900 System Hardware
Components.
Figure 5-1. DLP LightCrafter Single DLPC900 Hardware Components
6
DLP® LightCrafter™ Single DLPC900 Evaluation Module (EVM) User's Guide
Supported
DMD EVM Board
Supported DMD
Cable
DLPC900
LED Enable
Flash
and PWM
Control
2
I
C
Host
Connector
Power
JTAG/ICE
IT6535
Management
HDMI
DLPC900
USB
DisplayPort
EVM Board
TI DLP chipset
TI DLP chipset
Solid state memory
Solid state memory
Connectors
Connectors
Other
Other
Copyright © 2023 Texas Instruments Incorporated
Triggers
Single
DLPU101C – DECEMBER 2020 – REVISED MAY 2023
www.ti.com
Submit Document Feedback
Need help?
Do you have a question about the DLPC900EVM and is the answer not in the manual?