About This Guide

2 About This Guide
This guide explains the hardware and software features of the DLP LightCrafter Single DLPC900 EVM systems.
The EVM architecture and connectors are described along with a quick start guide on how to operate the
DLP LightCrafter Single DLPC900 EVM using a Graphical User Interface (GUI). Specific details for each DLP
component can be found in related component documentation.
Power supply, optics, illumination source, and cables are sold separately.

Figure 2-1. DLP LightCrafter Single DLPC900 Evaluation Module

4
DLP® LightCrafter™ Single DLPC900 Evaluation Module (EVM) User's Guide
Note
Copyright © 2023 Texas Instruments Incorporated
DLPU101C – DECEMBER 2020 – REVISED MAY 2023
Submit Document Feedback
www.ti.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DLPC900EVM and is the answer not in the manual?

Table of Contents