Co Installation - Culligan waterlogic BAR CLASSE Series Technical Manual

Table of Contents

Advertisement

CO
2
EQUIPMENT UNDER PRESSURE, HANDLE WITH CARE
For the replacement of the CO
qualified technical personnel.
The cylinders must not be lifted by the cap, or dragged, rolled or slid along the floor.
Even short distances, an appropriate hand cart or other suitable means of transport should be used.
To achieve a good level of carbonation the Ice Bath must be cold, a minimum of 1 hour after
start-up.
1. Before starting, ensure the CO
2. Remove the dust cap (where fitted) from the CO
3. Direct the outlet into a safe location, open the tap on the gas bottle for a second
and close again, this will purge the gas which will clear any dust from the outlet.
4. Connect the CO
the O-ring seal is correctly located.
5. After the installation of the machine, connect the pipework from the regulator [b] to the
machine [d] and secure the gas bottle in position with a strap or chain so it will not fall over.
6. Open the tap on the gas bottle and set the pressure to 4 bar [c].
7. Dispense 1L of sparkling water and allow a full regeneration.
8. Re-check and readjust the CO
dispense).
9. Dispense a glass of water and taste the water for correct sparkling flavour.
17
INSTALLATION
cylinder, all the operations must be carried out exclusively by
2
pressure regulator and tighten with a spanner, ensuring that
2
pressure to the machine (pressure tends to drop after first
2
gas bottle is food grade (E290).
2
outlet on the bottle.
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Firewall wlh2

Table of Contents