Installation
Materials
With the exception of media containers, open the remaining containers, remove all the components, and inspect
them before starting installation.
The following are necessary components for installing a CTM Softener.
Eductor Throat
Drain Adapter
Brine Elbow
Assembly
Lubricant (Dow Corning 111/Molykote 111, Not Provided)
Brine Tank (Sold Separately)
1/2" Brine Tubing (Not Provided)
8
Culligan® Top Mount (CTM) Water Softeners
Figure 2.
Eductor Nozzle
Flow Meter
(Comes with Valve)
Flow
Control
Body,
with inserts
Inlet Strainer
(Boxed Separately)
Materials
Plumbing Adapter
(Sold Separately)
Pressure
Relief
Distributor
GBE Controller
w/ bracket mounted
(Boxed separately)
Vacuum
Breaker
Media Tank
(Boxed
Separately)
Media
(Separate
Packaging,
See
Table 3 on
page
10)
8
Cat. No. 01029401