Culligan waterlogic BAR CLASSE Series Technical Manual page 15

Table of Contents

Advertisement

To start-up the product follow the instructions below. Some pre-installation piping is
required before installing the machine:
Unpack and carry out a visual inspection
of the unit.
1
Turn ON the power switch and allow for the Ice Bath to fill to the required level.
3
It should take approximately 8-10 minutes to fill the Ice Bath (Flow rate dependant) and 30 more
seconds to fill the sparkling tank.
4
Check the sanitizing instructions to complete the installation.
15
Connect the water supply. Ensure the
power switch on the rear of the machine
is in the OFF position and connect the
unit to a power supply and CO
2
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Firewall wlh2

Table of Contents