Nortel Meridian 1 Option 11C Upgrade Manual page 118

Hide thumbs Also See for Meridian 1 Option 11C:
Table of Contents

Advertisement

Page 118 of 224
Figure 51
Cable Routing Guide (shown with cables)
Mounting screws
3rd and 4th holes
in stiffener rail
553-3021-250
Standard 7.00
Upgrade cabinet hardware
13
Install the power supply grounding clip again (see Figure 48 on
page 116).
Note: Make sure you position the grounding clip so that it comes in
contact with the bottom of the power supply unit.
14
Install a multiple cable routing guide in the location below Slot 0
(the SSC slot or, possibly, the Fbr Rcvr slot).
You install the routing guide with the third and fourth rail stiffener
mounting screws (see Figure 51).
15
Install the remaining screws to fasten the stiffener rail.
The upgrade kit provides additional screws.
16
Attach an identification label to the space provided at the right
end of the stiffener rail. The label shows the appropriate cabinet
number (Main, 1, 2, 3, or 4).
17
Install the power supply unit again.
April 2000
Cable Routing Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1 11c mini

Table of Contents