Turret
5.5-8 Electronic Tilt Switch Setup
Procedure
Tilt Switch Replacement
Y AXIS
X AXIS
1. Park the MEWP on a firm level surface.
2. Disconnect the tilt switch from the 4 pin
connector.
NOTE
Make sure the part number of the old tilt switch
and new tilt switch are the same.
3. Remove the old tilt switch from the mount.
4. Install the new switch on the mount and connect
the switch plug to the 4 pin connector.
NOTE
The tilt circuit is only powered when the controls
are powered up.
5. Turn the main disconnect switch to the ON
position
.
6. Turn the base/off/platform key switch to the base
position
.
7. Pull out both emergency stop buttons
SJ63 AJ+, SJ63 AJ
8. Verify the switch is powered (the red or green
LED will be continually blinking).
9. Program the tilt switch:
a. Press and release the set up button 3 times.
Observe the LED flash codes as shown
below.
b. Only the red LED
blinks for 4 seconds.
c. Both LEDs flash for 1
second.
Results: The switch is
learning the new zero
position.
d. Both LEDs turn on
solid for 1 second.
Results: The new zero
position has been
learned.
e. The green LED flashes and then the red
LED will turns on solid for 2 seconds.
Results: The switch is verifying the new zero
position.
f. Only the red LED will
blink for 4 seconds.
10. Turn the main power disconnect switch to the off
position
11. Push in the emergency stop buttons
.
Section 5 – Procedures
Red LED
Green LED
Red LED
Green LED
.
Red LED
Green LED
Red LED
Green LED
Red LED
Green LED
Red LED
Green LED
Red LED
Green LED
Red LED
Green LED
.
229043AAA