Maintenance Schedule; Hako System Maintenance, Customer - HAKO 7580.32 Instruction Manual

Table of Contents

Advertisement

Maintenance and Service
5.3

Maintenance schedule

5.3.1 Hako system maintenance,
customer
Activity
Directly prior to starting operation:
Fill the solution tank (dose the cleaning agent, fill fresh water)
Before or after operation:
Check the properties of the deflectors to the right and left and repair them or replace the deflector
rubber (left and right) as necessary
Check the service brake in terms of its functionality and for signs of leaks; repair as necessary
Check the parking brake in terms of its functionality and for signs of leaks; repair as necessary
Check the squeegee is clean and undamaged
The following maintenance work must
be completed by the customer at the in-
tervals stipulated.
It relates to the daily and weekly main-
tenance work.
Interval
Daily
o
o
o
o
o
o
69

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scrubmaster b310 r/tb 1020

Table of Contents