Placing; Scope Of Delivery / Serial Accessories; Mains Connection; Storage Battery Operation (Optional) - KERN RFC Series Operating Manual

Price calculating balance
Table of Contents

Advertisement

Available languages

Available languages

7.2.1

Placing

7.2.2

Scope of delivery / serial accessories:

• Balance, see chap. 3
• Mains adapter
• Protective cover
• Operating manual

7.3 Mains connection

Power is supplied via the external mains adapter. The stated voltage value must be
the same as the local voltage.
Only use KERN original mains adapter. Using other makes requires consent by
KERN.

7.4 Storage battery operation (optional)

The optionally supplied battery is charged with the supplied power supply.
Before the first use, the battery should be charged by connecting it to the mains
power supply for at least 15 hours.
• If an arrow [] appears on the weight display above the battery symbol
capacity of the rechargeable battery will soon be exhausted. The balance will be
ready to operate for about another 10 hours, then it will switch off automatically.
Charge the battery with the help of the supplied power pack.
• If in the weight display appears „bat Lo" followed by a flickering display, the
capacity of the rechargeable battery is below the prescribed minimum. The
balance will be ready to operate for about another 5 minutes, then it will switch off
automatically. Charge the battery with the help of the supplied power pack.
The LED display informs you during loading about the loading status of the
rechargeable battery.
red:
Battery is almost discharged
green:
Rechargeable battery completely reloaded
RFC-BA-e-2113
Level balance with foot screws until the air bubble of the
water balance is in the prescribed circle.
, the
17

Advertisement

Table of Contents
loading

Table of Contents