Unpacking, Scope Of Delivery; Placing - KERN KBP V20 Installation Instructions Manual

Hide thumbs Also See for KBP V20:
Table of Contents

Advertisement

6.2 Unpacking, Scope of delivery

Remove the underconstruction and the weighing plate from the package, remove
packaging material and place the devices at the planned workplace. Check if all parts
of the scope of delivery are present and free of damage.
Scope of delivery:
• Underconstruction (lacquered steel)
• Weighing pan (stainless steel)
• Transport securing (depending on model, see chap. 2)
• Installation Instructions

6.3 Placing

1. Remove transport securing (see chap. 6.3.1).
2. Put the weighing plate on the underconstruction.
8
TKBP-V20-A-IA-e-2310

Advertisement

Table of Contents
loading

Table of Contents