Installing The Hydraulic Lines And Valves; Step 20 - HARVEST H13112 Assembly Manual

Table of Contents

Advertisement

FIG 19- 4
3)
Locate the Swing hopper pulleys (FIG 19-5, FIG 19-6)
FIG 19- 5
4) Locate the Swing hopper transport safety chain, Using a 3/8" x 1 1/2" bolt push through the pulley, Attach to
the top side of the bracket hopper transport arm, see FIG 19-1 Tighten the bolt on the pulley using a lock nut Do
not tighten all the way only till the lock nut is fully threaded.
5) Use a lock nut to tighten Have someone take a 5 1/2' board and place it against the upper bolt of the swing
hopper transport arm, as you lower the front of the auger.
6) Once lowered the auger should have a slight bow upwards.

Installing the hydraulic lines and valves

Step 20

1) Locate the hydraulic shut off valve (FIG 20-1)
FIG 20- 1
2) Hold so writing on valve is facing you, Apply Teflon on the pipe side of the fitting, Take 84" hose and attach to
right side, Take 8010-4 and connect to other end of 84" Pioneer fitting, wrap around PTO bracket, Take the long
(540") hydraulic hose and attach to the opposite side of the valve
3) Run along tube and attach with (p) cable clamps.
TRANSPORT ARM BRACKETS
FIG 19- 6
Page 28 of 68

Advertisement

Table of Contents
loading

Table of Contents