Jack Stand installation
Step 17
1) Locate the jack stand(FIG 17-2)
2) now to mount it to the hitch, there is a stub tube
FIG 17- 1
3)
(FIG 17-1) with holes drill in it slide the jack over the tube and align the holes for the jack to be in the working
position (jack holding the tongue off the ground) slip pin thought the holes on the jack and stub tube this will
keep the jack in place
4) When transporting the auger rotate the jack to lay in line with the tongue after hitching to transport vehicle,
by rotating the handle so that the pad come off the ground at a convent height, now removing the pin and
swivel the jack so the handle is towards the clevis hitch reinsert the pin. Reverse this process to remove auger
from transport vehicle.
Installation of clean out and cover plates
Step 18
1) Locate the cleanout plate (FIG 18-1)
FIG 18- 1
Jack mounting
Point on tongue
FIG-17- 2
Jack stand
Page 25 of 68