Commissioning; Preparations - Bredel 40-100 Operating Manual

Table of Contents

Advertisement

6

Commissioning

6.1

Preparations

WARNING
A frequency controller that is fitted without manual control can start the
pump automatically when power is applied.
WARNING
Disconnect and lock the power supply to the pump drive before any work
is carried out. In case the motor is fitted with a frequency controller and
has a single-phase power supply, wait two minutes to make sure that the
capacitors have discharged.
1.
Connect the electric motor and, if present, the frequency controller in conformance with the
locally applicable rules and regulations. Have the electrical installation work carried out by
qualified personnel.
2.
Check that the lubricant level is above the minimum level line in the inspection window. If
necessary refill with Bredel Genuine Hose Lubricant via the breather plug.
3.
Check that the correct number of shims corresponds with your application.
See also
Refer to "Frequency controller" on page 31
Refer to "Changing lubricant" on page 52
Refer to "Specifications" on page 92
38
m-bredel-40-100-en-05

Advertisement

Table of Contents
loading

This manual is also suitable for:

65-21002532

Table of Contents