6. Installation

1. The 3-phase current meter R718N3xxx(E) series has a
built-in magnet (see Figure 1 below). It can be attached
to the surface of an object with iron during installation,
which is convenient and quick.
To make the installation more secure, please use screws
(purchased separately) to fix the device to the wall or
other objects (such as the installation diagram).
Note: Do not install the device in a metal shielded box or in
an environment surrounded by other electrical equipment
to avoid affecting the wireless transmission of the device.
4. The 3-phase current meter samples the current according
to MinTime. If the current value sampled this time
relatively exceeds the set value (the default is 100mA)
more than the current value reported last time, the device
will immediately report the current value sampled this
time. If the current variation does not exceed the default
value, the data will be reported regularly according to
MaxTime.
5. Press the [Key] of the device to start sampling data and
report the data after 3 to 5 seconds.
Note: MaxTime must be set greater than Min Time.
2. Open the clamp-on current transformer, and then pass the
live wire through the current transformer according to the
installation.
Note: "L←K" is marked on the bottom of the CT.
3. Precautions:
⚫ Before using, user must check whether the appearance is
deformed; otherwise, the test accuracy will be affected.
⚫ The using environment should be kept away from strong
magnetic fields, so as not to affect the test accuracy. It is
strictly forbidden to use in humid and corrosive gas
environments.
⚫ Before installation, please confirm the current value of the
load. If the current value of the load is higher than the
measurement range, select a model with a higher
measurement range.
The three-phase current detector R718N3xxx(E) is suitable for
the following scenarios:
⚫School
⚫Factory
⚫Shopping mall
⚫Office building
⚫Smart building
Where the electrical data of the device with the three-phase
electricity needs to be detected.