Installation - netvox R718N3 Series User Manual

Wireless 3-phase current meter
Hide thumbs Also See for R718N3 Series:
Table of Contents

Advertisement

6. Installation

1. The single-phase current detector (R718N1) has a
built-in magnet (see Figure 1 below). It can be attached
to the surface of an object with iron during installation,
which is convenient and quick.
To make the installation more secure, please use screws
(purchased separately) to fix the device to the wall or other
objects (such as the installation diagram).
Note: Do not install the device in a metal shielded box or in
an environment surrounded by other electrical equipment
to avoid affecting the wireless transmission of the device.
4. The three-phase current detector (R718N3) samples the
current according to MinTime. If the current value sampled
this time relatively exceeds the set value (the default is
100mA) more than the current value reported last time, the
device will immediately report the current value sampled
this time. If the current variation does not exceed the
default value, the data will be reported regularly according
to MaxTime.
Press the [Key] of the device to start sampling data and
report the data after 3 to 5 seconds.
Note: MaxTime must be set greater than Min Time.
2. Open the clamp-on current transformer, and then pass
the live wire through the current transformer according to
the installation.
Note:
"L←K" is marked on the bottom of the CT.
3. Precautions:
⚫ Before using, user must check whether the appearance
is deformed; otherwise, the test accuracy will be
affected.
⚫ The using environment should be kept away from
strong magnetic fields, so as not to affect the test
accuracy. It is strictly forbidden to use in humid and
corrosive gas environments.
⚫ Before installation, please confirm the current value of
the load. If the current value of the load is higher than
the measurement range, select a model with a higher
measurement range.
The three-phase current detector (R718N3) is suitable for
the following scenarios:
⚫ School
⚫ Factory
⚫ The mall
⚫ Office building
⚫ Smart building
Where the electrical data of the equipment with the
three-phase electricity needs to be detected.