Connecting the 4G LTE Cable
1. Connect the factory-installed network cable
to the DATA port on the POE module, and
the factory-installed power cable to the
POE module.
Connecting the Three-Phase AC Power Cable (a Circuit Breaker as the
6.7
Three-Phase Input Switch)
For the smart array controller that houses one PID module, connect the three-phase AC power
cable to the QF02 switch, and the functional earthing cable to the FE01 port on the functional
earthing bar.
For the smart array controller that houses two PID modules, connect the three-phase AC power
cable of the first route to the QF02 switch, and the corresponding functional earthing cable to
the FE01 port on the functional earthing bar. Connect the three-phase AC power cable of the
second route to the QF04 switch, and the corresponding functional earthing cable to the FE02
port on the functional earthing bar.
This section describes how to connect three-phase AC power cables for the smart array
controller that houses two PID modules. For details about how to connect a three-phase AC
power cable for the smart array controller that houses one PID module, refer to the way of
connecting the three-phase AC power cable of the first route.
1. Prepare a cable.
2. Crimp an OT terminal.
3. Connect the L1, L2, and L3 cables to the three-phase input switch. Connect the functional
earthing cable to the functional earthing bar.
2. Connect the CPE network cable to the POE
port on the POE module.
18