3. Connect the battery connector
⇒ The LED
(up to 10 seconds).
SITRANS SCM IQ: Smart Condition Monitoring with IIoT Sensors
Operating Instructions, 07/2023, A5E50573389-AD
④
③
placed on the PCB lights up for one second after the boot process is completed
7.5 Powering up SITRANS MS200
to the PCB.
Commissioning
49