Connecting Sitrans Cc220 - Siemens SITRANS SCM IQ Operating Instructions Manual

Smart condition monitoring with iiot sensors
Hide thumbs Also See for SITRANS SCM IQ:
Table of Contents

Advertisement

Connecting SITRANS CC220

6.2 Connecting SITRANS CC220
6.2.2
Connecting SITRANS CC220
Before connecting SITRANS CC220
• You have connected functional grounding (Page 42).
• You are using the supplied terminal.
• A two-core cable meet the following requirements:
– a copper (Cu) cable with cross-section of 0.75 to 2.5 mm
– rated temperature 70 °C
• A slotted screwdriver with a 3 mm blade.
Procedure
1. Switch off the power supply.
2. Connect the lines to the connecting terminal with a torque of 0.56 Nm (5lb-in).
3. Connect the connecting terminal to the connection for the power supply.
⇒ STAT LED is blinking green.
⇒ PWR LED is lighting green.
4. Integrate SITRANS CC220 into your network using Ethernet port X1 LAN - P1.
Figure 6-1
5. Make sure SITRANS CC220 has an internet connection.
⇒ After onboarding (Page 52):
– If there is an active internet connection USER 2 LED is lighting green.
– If there is no internet connection USER 2 LED is blinking fast orange.
44
Ethernet connection X1 LAN - P1
2
SITRANS SCM IQ: Smart Condition Monitoring with IIoT Sensors
Operating Instructions, 07/2023, A5E50573389-AD

Advertisement

Table of Contents
loading

Table of Contents