baltur TBG 55PN-V Instructions Manual page 32

Table of Contents

Advertisement

Available languages

Available languages

The gas supply scheme is shown in the diagram below. The gas train is certified in accordance with regulations EN 676 and
is supplied separately from the burner.
A manual shut off valve and anti-vibration joint must be installed upstream of the gas valve, as shown in the dia-
gram.
GENERAL GAS BURNER SYSTEM
Legend
1)
Manual shut off valve
2)
Anti-vibration joint
3)
Gas filter
4)
Minimum gas pressure switch
5)
Safety valve
6)
Pressure regulator
7)
Valves seal control device
(obligatory for burner with maximum
nominal thermal output
over 1200 kW)
POWER SUPPLY LINE
Gas train
supplied by the manufacturer
8)
9)
10)
11) Air pressure switch
12)
30 / 71
0006081042_200806
The job of the installer
Pneumatic working valve
Control servomotor
Air adjustment gate
Combustion head
N° 0002910950
REV.: 10/05/06

Advertisement

Table of Contents
loading

Table of Contents