START UP OF THE MACHINE

Take off the BASE and CATALYST suction rods from the solvent containers and introduce
them in their respective container.
Caution : never invert the suction rods.
Open the drain valves located at the outlet of the fluid sections. Start up the pumps. Prime the
pumps, then close the drain valves.
Pass to production mode and let the fluid flow until it flows clean. In case of alarm, disable
then go to production mode.
CAUTION : do not supply atomising air to the gun.
Carry out a flushing to clean the mixed circuit. As soon as the solvent is clean, pass to ESC.
The parameters are preset up in the factory. You can change them (refer to § 9).

MIXING RATIO CHECKING

VP3
A test
A
B
19
Nota : design of the mixing ratio assembly of the units,
model PU 3000 Pneumatic and PU 3000 Airmix
Switch off the unit.
Remove the 'mixed fluid' hose located on the outlet of the mixing unit. Install, instead of it, the
fitting (21 or 25) and the needle-valve assembly (16 or 19) supplied with the machine.
Take off the control air hose on the VP2A BASE valve.
Connect that hose to the VP3 valve. The VP3 valve is originally supplied with a needle valve
assembly (16 or 19).
Switch on the unit.
Pass in F 5 mode to adjust the opening of the needle-valves.
SAMES KREMLIN
VP2B
VP2A
SA
VP1
25
19
Page 20
VP3
B
A
A test
VP2A
16
Nota : design of the mixing ratio assembly of the units,
model PU 3000 Airless and PU 3000 4 L
VP2B
Manual : 573.199.112
SA
VP1
21
16

Advertisement

Table of Contents
loading

Table of Contents