5. INSTALLATION
HANDLING
The PU 3000 system with relevant weight and
dimensions must be handled by appropriate means.
Nota : The handling of the machine must be carried out
by a qualified staff, in an appropriate space, correctly
cleared to avoid any risks of fall or of crushing of people.
Nota : The ring located above the cover is for
the hoisting of the pump and shall not be used for the
handling of the complete machine.
The frame has 4 holes ( 9) to be fixed on a bracket or
on the floor.
STORAGE
Storage before installation :
-
Storage ambient temperature : 0 / + 50 °C. / 32 / +122° F
-
Protect the equipment against dust, running water, dampness and shocks.
Storage after installation :
-
Operating temperature : + 15 / + 35 °C. / + 52 / + 95° F
-
Protect the equipment against dust, running water, dampness and shocks.
ENVIRONMENT ON THE AREA
The unit must be installed on a horizontal stable floor (eg : flagstone).
Ensure the machine is stable.
The working area must be correctly ventilated.
SAMES KREMLIN
Page 11
Manual : 573.199.112