6.3 Remove the back plate from the PIR light controller.
All manuals and user guides at all-guides.com
6.4 Mark the position of the mounting holes on the
6
6.5 Drill the holes ensuring not to infringe with any
6.6 Pass the 230V 50Hz mains supply and load
wall using the back box as a template.
gas/water pipes or electrical cables that may be
hidden below the surface. Insert the rawl plugs
into the holes.
cables through the cable entry point on the
backing plate, ensuring the grommet(s) is used to
maintain the IP rating of the PIR light controller.
Need help?
Do you have a question about the SLB2300RF and is the answer not in the manual?
Questions and answers