Maintenance And Inspection Calendar; Disposal - Taurus RB10.5 Pro Assembly And Operating Instructions Manual

Hide thumbs Also See for RB10.5 Pro:
Table of Contents

Advertisement

5.4

Maintenance and Inspection Calendar

To avoid damage from body sweat, the equipment must be cleaned with a damp towel (no solvents!)
after each training session.
The following routine tasks must be performed at the specified intervals:
Part
Display console
Lubrication of moving parts
Plastic covers
Screws and cable connections
Check pedals for tightness
Legend: C = clean; I = inspect
By scanning the QR code with the camera function or QR code scanner app of your
smartphone/tablet, a video on general maintenance of an exercise bike opens on
YouTube. The video serves to illustrate the maintenance points described in this
manual.
Please note that the video may not be available in your language or with appropriate
subtitles.
If you cannot scan QR codes, you can access all Sport-Tiedje videos on YouTube by
first opening YouTube and entering "Sport-Tiedje" in the search field.
6

DISPOSAL

At the end of its operational life, this equipment cannot be disposed of in normal household waste.
Instead, it must be disposed of via an electricals recycling centre. Further information can be
obtained from your local authority's recycling service.
The materials can be recycled as per their symbols. Through the reuse, recycling
of materials or other forms of recovery of old equipment, you make an important
contribution to the protection of the environment.
38
Weekly
Monthly
C
I
C
I
I
I
RB10.5
Quarterly
I

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tf-rb105-2

Table of Contents