Install The Tower To Rack Conversion Kit; Install The Eia Brackets - Lenovo ThinkSystem ST650 V2 Setup Manual

Hide thumbs Also See for ThinkSystem ST650 V2:
Table of Contents

Advertisement

Install the tower to rack conversion kit

This section includes instructions on how to install the tower to rack conversion kit.

Install the EIA brackets

Step 1.
If foot stands are installed on your tower server, lay the server on its side and remove them first.
a.
For each foot stand, rotate the foot stand inwards.
Figure 99. Adjusting foot stand
b.
For each foot stand, use a screwdriver to remove the screw that secures the foot stand; then,
remove the foot stand from the chassis.
Figure 100. Removing foot stand
Step 2.
Lay the server on its side; peel away the plastic and apply ruler label to rear corner of side cover as
shown.
.
Chapter 4
Server hardware setup
145

Advertisement

Table of Contents
loading

Table of Contents