TESTO 350 S Short Manual page 39

Table of Contents

Advertisement

Available languages

Available languages

Messprogramm konfiguriert
Measuring program in progress
- Overview of programmed long-term measurement appears.
8 Confirm measurement program with
- Measurement program takes effect and is configured:
Start
9 Press function key
- Long-term measurement begins:
The
symbol shows which program is currently running.
Long-term measurement starts with fresh air/rinse phase:
Fresh a a ir r r inse
Z Z eroing 1 1 Z Z eroing 2 2 E E xposure t t o g g as
0
1
2
Fresh air time between measuring cycles:
Set fresh air time
Rinse
F F resh a a ir
Z Z eroing 1 1 Z Z eroing 2 2 E E xposure t t o g g as
Rinsing is ended once
rinse limits are reached.
Minimum and maximum measuring and fresh air cycles:
Measuring cycles:
Fresh air cycles:
Stop
10
ends the programmed measurement ahead of time.
- The measuring program remains activated (indicated by the symbol
- Generally, there is a rinsing phase of 2 minutes after the measuring program is
finished (pump slow).
6.2.3 Restarting measuring program
Start
Press
function key.
- Measuring program starts again.
6.2.4 Deleting programming in instrument
Memory
Program
1 Select
–>
Measuring program is only deactivated and is not deleted.
Memory
Program
2 Select
–>
- The last measuring program activated is shown.
3 Press the
function button to reactivate.
.
.
Constant 6min
3
4
5
2 min to 240 min (4 h)
5 min to 1440 min (24 h)
Delete
–>
–>
Info
–>
.
6. Measurement examples 39
Measure
t in min
6
Measure
t
).
.

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

350 m350 xl

Table of Contents