Testing Functionality By Secondary Injection; Testing Disturbance Report; Introduction; Disturbance Report Settings - Hitachi Relion RES670 Commissioning Manual

Phasor measurement unit
Hide thumbs Also See for Relion RES670:
Table of Contents

Advertisement

1MRK 511 409-UUS Rev. K
Section 11
11.1

Testing disturbance report

11.1.1

Introduction

The following sub-functions are included in the disturbance report function:
Disturbance recorder
Event list
Event recorder
Trip value recorder
Indications
If the disturbance report is enabled, then its sub-functions are also set up and so it is not possible to only
disable these sub-functions. The disturbance report function is disabled (parameter Operation =
Disabled) in PCM600 or the local HMI under Main menu/Settings/IED Settings/Monitoring /
Disturbance report/DRPRDRE:1 .
11.1.2

Disturbance report settings

When the IED is in test mode, the disturbance report can be made active or inactive. If the disturbance
recorder is turned on during test mode, recordings will be made. When test mode is switched off all
recordings made during the test session are cleared.
Setting OpModeTest for the control of the disturbance recorder during test mode are located on the local
HMI under Main menu/Settings /IED Settings/Monitoring/Disturbance report /DRPRDRE:1.
11.1.3

Disturbance recorder (DR)

A Manual Trig can be started at any time. This results in a recording of the actual values from all
recorded channels.
The Manual Trig can be started in two ways:
1.
From the local HMI under Main menu/Disturbance records .
1.1. Enter on the row at the bottom of the HMI called Manual trig.
1.2. Navigate to General information or to Trip values to obtain more detailed information.
2.
Open the Disturbance handling tool for the IED in the plant structure in PCM600.
2.1. Right-click and select Execute manual Trig in the window Available recordings in IED.
2.2. Read the required recordings from the IED.
2.3. Refresh the window Recordings and select a recording.
2.4. Right-click and select Create Report or Open With to export the recordings to any disturbance
Phasor measurement unit RES670
Commissioning manual
Testing functionality by secondary
injection
A new recording begins. The view is updated if you leave the menu and return.
analyzing tool that can handle Comtrade formatted files.
© 2017 - 2022 Hitachi Energy. All rights reserved
Section 11

Testing functionality by secondary injection

M17101-2 v7
M11746-2 v7
M11750-2 v7
81

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents