Section 11
Testing functionality by secondary injection
t(s)
TD1
V
Vpickup< Set pickup voltage for step 1
For example, if the measured voltage jumps from the rated value to 0.8 times the set pickup
voltage level and time multiplier TD1 is set to 0.05 s (default value), then the TRST1 and TRIP
signals trip at a time equal to 0.250 s ± tolerance.
10.
The test above can be repeated to check the inverse time characteristic at different voltage levels.
11.
Repeat the above described steps for Step 2 of the function.
Extended testing
The tests above can be repeated for 2 out of 3 and for 3 out of 3 operation mode.
11.5.1.2

Completing the test

Continue to test another function or end the test by changing the TESTMODE setting to Disabled.
Restore connections and settings to the original values, if changed for testing purposes.
11.5.2

Two step overvoltage protection OV2PTOV (59)

Prepare the IED for verification of settings as outlined in section
for test"
in this chapter.
11.5.2.1

Verifying the settings

Verification of single-phase voltage and time delay to trip for Step 1
1.
Apply single-phase voltage below the set value Pickup1.
2.
Slowly increase the voltage until the PU_ST1 signal appears.
3.
Note the trip value and compare it with the set value Pickup1.
For phase-to-ground measurement:
Vpickup
ANSIEQUATION2426 V1 EN-US
For phase-to-phase measurement:
Vpickup
ANSIEQUATION2427 V1 EN-US
4.
Decrease the voltage slowly and note the reset value.
5.
Set and apply about 20% higher voltage than the measured trip value for one phase.
6.
Measure the time delay for the TRST1 signal and compare it with the set value.
120
Trip time in seconds
Settable time multiplier of the function for step 1
Measured voltage
The trip value in secondary volts is calculated according to the following equations:
>
VBase
VT
sec
´
´
100
VTprim
3
>
VT
sec
´
´
VBase
100
VTprim
© 2017 - 2022 Hitachi Energy. All rights reserved
1MRK 511 409-UUS Rev. K
"Requirements"
and section
Phasor measurement unit RES670
Commissioning manual
M13796-35 v8
M13796-25 v5
M13806-2 v6
"Preparing
M13806-9 v2
M13806-50 v10
(Equation 92)
(Equation 93)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents