10.7

Testing the protection functionality

Each protection function must be tested individually by secondary injection.
Verify operating levels (trip) and timers.
Verify alarm and blocking signals.
Use the disturbance handling tool in PCM600 to evaluate that the protection function has received
the correct data and responded correctly (signaling and timing).
Use the event viewer tool in PCM600 to check that only expected events have occurred.
10.8

Forcing of binary input/output signals for testing

10.8.1

Forcing concept

Forcing of binary inputs and outputs is a convenient way to test wiring in substations as well as testing
configuration logic in the IEDs. Basically it means that all binary inputs and outputs on the IED I/O
modules (BOM, BIM, IOM & SOM) can be set to a value (i.e active or not-active), selected by the user,
while the IED is in test mode. For inputs, this is true regardless of the actual signal voltage present on the
input. For outputs, any output relay can be forced to be active or not, regardless of the current requested
state of the output in the IED logic configuration.
Phasor measurement unit RES670
Commissioning manual
PCM600 disturbance report tool display after communication interruption
© 2017 - 2022 Hitachi Energy. All rights reserved
IEC10000032-1-en.vsd
GUID-125B6F28-D3E5-4535-9CD6-6C056B79F496 v2
GUID-3FD8C676-10E5-432A-8CD5-4643299AD794 v2
Section 10
Testing IED operation
73

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents