Completing The Test; Station Communication; Multiple Command And Transmit Multicmdrcv / Multicmdsnd; Remote Communication - Hitachi Relion RES670 Commissioning Manual

Phasor measurement unit
Hide thumbs Also See for Relion RES670:
Table of Contents

Advertisement

1MRK 511 409-UUS Rev. K
5.
Increase the supply currents or voltage in next 1 minute cycle such that the active or reactive energy
values are greater than the EALim and ERLim setting default values respectively.
6.
Check that EAFALM and ERFALM are high after 1 minute.
7.
Similarly the testing can be done for EARALM and ERRALM outputs by changing the power inputs
directions through direction settings.
11.12.2.2

Completing the test

Continue to test another function or end the test by changing the TESTMODE setting to Disabled.
Restore connections and settings to the original values, if changed for testing purposes.
11.13

Station communication

11.13.1

Multiple command and transmit MULTICMDRCV / MULTICMDSND

The multiple command and transmit function (MULTICMDRCV / MULTICMDSND) is only applicable for
horizontal communication.
Test of the multiple command function block and multiple transmit is recommended to be performed in a
system, that is, either in a complete delivery system as an acceptance test (FAT/SAT) or as parts of that
system, because the command function blocks are connected in a delivery-specific way between bays
and the station level and transmit.
Command and transmit function blocks included in the operation of different built-in functions must be
tested at the same time as their corresponding functions.
11.14

Remote communication

11.14.1

Binary signal transfer

Prepare the IED for verification of settings as outlined in section
To perform a test of the binary signal transfer functions, the hardware (LDCM) and binary input and
output signals to transfer must be configured as required by the application.
There are two types of internal self-supervision of the binary signal transfer:
The I/O-circuit board is supervised as an I/O module. For example it generates FAIL if the board is
not inserted. I/O-modules not configured are not supervised.
The communication is supervised and the signal COMFAIL is generated if a communication error is
detected.
Status for inputs and outputs as well as self-supervision status are available from the local HMI under
Self-supervision status: Main menu /Diagnostics /Internal events
Status for inputs and outputs: Main menu /Test /Function status , browse to the function group of
interest.
Remote communication related signals: Main menu /Test /Function status /Communication /
Remote communication
Phasor measurement unit RES670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved
Testing functionality by secondary injection
"Preparing the IED to verify
Section 11
M13906-301 v5
SEMOD53595-1 v1
SEMOD172432-5 v3
SEMOD53601-1 v1
M14951-2 v6
settings".
147

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents